Coal Fired Power Plant Engineering Part 3: Project Plan Execution
Out of the Box Solution in Action In part 1 of this series, we introduced a case study: Updating Coal Industrial Dust Collection Infrastructure. In 2017, a large utility with a Tier One (2) unit coal fired base loaded plant in Wisconsin needed to upgrade their...