Case Studies – Capital & Maintenance

Tabletop Structure Evaluation

Brindley Engineering was called into a refinery for a project that involved five reinforced concrete tabletop structures supporting large vertical vessels.  A change in the catalyst removal along with the replacement process for the vessels was proposed that would...

Read More

soil bearing pressure analysis

Sour Water Hydraulic Study

A Midwest refinery client was replacing sections of sour water collection piping as part of an ongoing piping replacement project and had decided to upsize a section of the collection header to improve flow.  This decision was based on the observation that some...

Read More

Archives